TAKAHATA SEIKO CO., LTD.
SITE MAP INQUIRIES JAPANESE
Home Company Profile Product Data Service Information
Service Information
Production Solutions
Production Network
TAKAHATA Development Technology
Quality Assurance
Introducing the Departments
Concurrent Engineering
Image Faster Time to Market and High Profitability
Concurrent Engineering is one of the important key words of the TAKAHATA production system. Various processes of product development are conducted concurrently in order to bring products to market more quickly and assure higher profitability. CAD/CAM/CAE systems are conventionally installed on the manufacturers’ side. As most of the systems are used in closed loops within individual departments, only those departments benefit from the systematization effect. The introduction of concurrent engineering allows different departments within TAKAHATA to execute various production processes at the same time. This reduces the incidence of design errors in upstream departments and shortens the time from product development to product completion. CAD/CAM/CAE systems are simply tools to support concurrent operations. Though important to concurrent engineering, they are by no means the most important. The factors of "System" and "Organization" hold this distinction. When building the database, for example, it must be sufficiently integrated to allow separate processes to retrieve data on products under development whenever necessary. In setting up the organization, personnel involved in related processes must communicate smoothly to facilitate decision making. Concurrent engineering at TAKAHATA isn’t just another new production system.
•Important Factors of Concurrent Engineering
  System Organization Supporting technology
Design Reserve scheduling
Early determination of specifications
High-quality design
Virtual prototype
New evaluation system (Y-ELF)
Cross-sectional project
Development personnel design system
Collocation (deployment by functional proximity)
Parallel action
CAD
Production Production cycle materials: procurement
Produce right first time
Lean production
- -
VE Concurrent VE
- -


Copyright 2001-2003 TAKAHATA GROUP All Rights Reserved